PDSP Inspection & Maintenance Schedule
Oil Changes
- 300 operating hours after the initial commissioning
- Every 3000 operating hours or at least every 3 months
- If not being used regularly, every 2000 operating hours, or at least every 3 months
SP-LR Sanitary Self-Priming Liquid Ring Pump Inspection & Maintenance Schedule
Routine inspection and maintenance can avoid unnecessary and expensive downtime as well as operating costs. It is recommended to check the following on a daily basis:
- That the valve in the suction pipe is completely open
- That the inlet pressure is not too low in order to avoid the occurrence of cavitation
- The delivery pressure is in line with system requirements
- That the shaft seals are not leaking.
- Pressure and Flow of the flushing system, if present
- The temperature of the heating/cooling system, if present
For IG & IGH Variants periodically check the bearing oil levels. The oil must be changed annually or after every 5000 operating hours.